For Sale 220.000,00€ - Apartments
For sale are new penthouse apartments with roof terrace on Ciovo. There are two apartments available for sale – S3 and S4, placed on the second floor. The apartments offer wonderful views of the sea and the surrounding area from their roof terraces. Apartment marked as S4 is slightly smaller, consisting of a an open-plan living space, two bedrooms, one bathroom, a hall and a covered balcony. The interior space has 52.47 m2, 9.46 m2 is the covered balcony and 64.62 m2 is the roof terrace. This combined gives 75.86 m2 of net living space. The price of S4 is €240,000 (in pre-sale phase there is a possibility of negotiating a price of €220,000 depending on the amount of the down payment). Apartment marked as S3 is slightly larger and has an additional bathroom and storeroom. Its interior has 54.59 m2, 15 m2 is the surface of the covered balcony and 75.19 m2 is the roof terrace. This gives a total of 83.39 m2 of net living space. The price of S3 is €260,000 (during the pre-sale phase the investor offers a possibility of negotiating a price of €240,000 depending on the amount of the down payment). Each apartment includes one parking space.
These new penthouse apartments with roof terrace on Ciovo are built to high standards and are well equipped with air conditioners, triple-pane insulating glass with mosquito nets on all windows and balcony doors, first-class aluminum carpentry, modern tiles in the kitchen and parquet floors in the rooms, electric blinds, excellently equipped bathrooms, video surveillance, anti-burglary and fire-resistant entrance door and superior thermal and hydro insulation. It is possible to install underfloor heating if desired. The roof terraces come with installations for summer kitchen. This is a residential and commercial building located on a slightly elevated position with a view of the sea from both above-ground floors. This is an attractive location, great for buyers looking for real estate to live in, since all facilities are nearby and the sea is only a few minutes’ walk away. Construction works are underway, the planned completion of works is summer 2024. The handover of the apartments is planned for the end of 2024.