Modern villa with view Primosten

  • modern villa with a view primosten - 3040 (1)
  • modern villa with a view primosten - 3040 (2)
  • modern villa with a view primosten - 3040 (3)
  • modern villa with a view primosten - 3040 (4)
  • modern villa with a view primosten - 3040 (5)
  • modern villa with a view primosten - 3040 (6)
  • modern villa with a view primosten - 3040 (7)
  • modern villa with a view primosten - 3040 (8)
  • modern villa with a view primosten - 3040 (9)
  • modern villa with a view primosten - 3040 (10)
  • modern villa with a view primosten - 3040 (11)
  • modern villa with a view primosten - 3040 (12)
  • modern villa with a view primosten - 3040 (13)
Općina Primošten, Šibensko-kninska županija, 22202, Hrvatska
For Sale 1.100.000,00€ - Houses
3040 242 sq ft 4 Bedrooms 4 Bathrooms 4 Garages 570 sq ft

Modern villa with view Primosten, under construction and located in a quiet part of Primosten, 850 meters from the beach and the town center is for sale. The villa was built on a plot of approximately 570 sqm, has a total net useful area of ​​approximately 242 sqm and will be spread over 2 floors. There is a garage, engine room, wellness with toilet, additional guest toilet, kitchen with dining room and living room on the ground floor with access to a beautiful covered terrace with a summer kitchen, sitting area and sunbathing area by the pool. An internal staircase leads to the first floor which contains of four bedrooms, each with its own bathroom and a dressing room, a storage room and a hallway. The master bedroom offers access to a spacious, pergola-covered terrace of 22 sqm.

Modern villa with view Primosten is being built and furnished with quality materials and equipment: electric roller blinds, parquet/ceramic floors at the customer’s choice in the price range according to the cost list, the living room and bathrooms will have underfloor heating via a heat pump, in the garage there will be charging stations for electric cars and the pool will be concrete heated. The yard will have secured parking for three cars. The possibility of changing materials and equipment at the customer’s choice and with additional payment, depending on the possibility of adaptation and the stage of the works performed on the building. The planned completion date of the facility is July 2025.

Property Map

Similar Properties